The short answer
Turn the conflict into a documented scope question. Identify the departments, the exact issue and the drawings each person reviewed, then ask for coordinated written direction before changing the project.
In this guide
Check whether the answers address the same question
Two apparently conflicting responses may concern different parts of a project. Planning might discuss permitted use while building staff discuss construction documents. A counter answer may have assumed a simpler scope than the submitted drawings. Write down the actual question and response before deciding someone has contradicted a prior approval.
Include the date, staff role, permit number and documents presented. Avoid a summary such as the city said yes when the underlying answer was only that an application could be submitted. Precise records make it possible for staff and your project team to resolve the difference.
Confirm jurisdiction and review responsibility
First establish that the agencies being compared serve the same property and scope. The San José: SJPermits and SJePlans Help property instructions address city-jurisdiction lookup, while San Mateo County: Apply for a Permit describes its unincorporated county process. Alameda County's Alameda County: Permits covers its listed county services. A postal city and county name do not establish interchangeable rules.
Once jurisdiction is settled, identify which reviewer owns the disputed item. If it affects several departments, ask the project contact how to obtain coordinated direction. Copying every public email address into an angry message can obscure the technical question rather than help the person who can resolve it.
Prepare a one-page issue brief
State the proposed work, the conflicting instructions, the relevant drawing sheets and the decision needed. Attach the actual comments or correspondence. Ask whether one response supersedes another, whether the design changed between them, and what final requirement the next submission should address.
A useful brief might say that the planning response accepts a specified layout while a building comment requires a construction change affecting it. The question is how to coordinate that change, not which department wins. Ask the designer to propose a solution and show its effect on both review concerns.
Distinguish clarification from an appeal
Sometimes the issue is simply missing context and staff can clarify it. In other cases, the agency may identify a formal decision or process for review. Ask which situation applies and where its procedure is published. Do not assume a general email preserves a deadline or that disagreement automatically creates an appeal right.
The county San Mateo County: Apply for a Permit page illustrates that planning review can involve several agencies and, for applicable decisions, separate appeal procedures. Use the procedure tied to your decision and jurisdiction. If a formal deadline or substantial dispute arises, get advice based on the actual notice and record.
Keep the team on one instruction set
After clarification, circulate the agreed response to the designer, contractor and relevant consultants. Update the comment register and current drawing version. Mark superseded assumptions clearly so a trade does not continue building from the earlier interpretation.
In a hypothetical remodel, fire and building comments affect a shared area. A coordinated response might require a drawing change and an updated scope price. The owner needs both before authorizing the work. A written resolution is useful not because it guarantees future approval, but because it gives the next submission a clear, consistent basis and reduces repeated debates about what someone recalls being told.
A clarification email structure
Open with the permit number, address and one-sentence scope. Then quote or attach the two instructions with their dates. Explain the practical decision affected, such as a drawing revision or the sequence of an outside clearance. Ask which requirement governs and whether the departments need a coordinated response from your team. Keep the question narrow enough that staff can identify who should answer it.
Include a marked-up drawing only as an explanatory working copy, with the underlying approved or submitted version identified. Do not send an altered document that could be mistaken for the official current set. If the designer proposes a resolution, label it proposed and ask for the appropriate review path.
After receiving an answer, summarize your understanding and confirm any remaining ambiguity before instructing the contractor. Archive both the original conflict and resolution. If a later reviewer raises the same point, the record shows the actual facts and direction used rather than a recollection that someone at the counter said it was okay. This approach remains useful even if the final answer requires more work than the owner hoped.
If the conflict arose after a scope revision, attach the change summary. Staff may be answering different versions without realizing it. Showing the revision date and affected sheet can resolve a procedural disagreement more efficiently than repeating the same general question to additional people.
Related questions
Should I rely on a verbal counter answer?
Use it to advance the question, but request written project-specific clarification when it affects design, cost or a conflicting comment.
Does emailing staff count as filing an appeal?
Do not assume that. Follow the process and deadline stated for the actual agency decision.
Official sources
Why readers ask this question
These public discussions informed the topic. Individual experiences are not permit rules, verified prices or professional advice.